References PPP / BOT / EBC / O&M

2012 – 2014, Czech Republic

  • NWL Prague (2 Million PE)
  • Qd = 354,000 m³/d
  • Design, supply and installation of mechanical
    equipment, and turnkey construction
  • Total investment: 362 million EUR
  • Contract period: 51 months incl. one year of
    operation
  • Member of Supervisory Board until 12/2014
  • Yellow Book FIDIC

2012 – 2014, Cyprus

  • WWTP Larnaca (100,000 PE)
  • Qd = 18,000 m³
  • Design, Build and Operation of the extension and
    upgrading of the WWTP during on-going operation
  • 35.9 million EUR
  • Contract period: 2012 – 2015 / Date of completion: expected in 2014
  • Principal Engineer until 12/2014
  • Yellow Book FIDIC + operation services one year

2010 – 2012, Cyprus

  • WWTP New Nicosia (269,115 PE)
  • Qd = 30,000 m³/d
  • Design and turn-key construction of waste water treatment plant with membrane bio reactor
  • 24,8 million EUR
  • Contract period: 2010 – 2022 / Date of completion: November 2012
  • Principal Engineer
  • Yellow Book FIDIC + operation services 10 years

2008 – 2011 , Poland

  • WWTP Sitkowka in Kielce/Poland (300,000 PE)
  • Qd = 51,000 m³/d
  • Reconstruction and extension of WWTP.
  • Total Investment: (58 million EUR)
  • Contract period: 38 months / Date of completion: August 2011
  • Member of Supervisory Board on behalf of the Lead
    Member of the Consortium
  • Yellow Book FIDIC

2008 – 2012 , Poland

  • WWTP Czajka (2.1 million PE)
  • Qd = 450,000 m³/d
  • Design and mechanical equipment of the mechanical stage of Czajka WWTP, primary treatment as well as sludge treatment
  • 550 million EUR total
  • Member of Supervisory Board on behalf of the Consortium
  • Yellow Book FIDIC

2006 – 2009, Estonia

  • WWTP Kohtla-Järve (192,000 PE)
  • Qd = 24,900 m³/d
  • Extension of the plant for with extended aeration for nutrient removal; sludge: design of sludge hygienisation, composting plant
  • 26.3 million EUR
  • Principal Engineer
  • Yellow Book FIDIC

2008 – 2009, Lithuania

  • WWTP Vilnius (660,000 PE)
  • New construction of sludge treatment incl. thermohydrolyses plant for sludge disintegration and drying plant
  • 45 million EUR
  • Principal Engineer
  • Yellow Book FIDIC

2006 – 2008, Cyprus

  • WWTP Anthoupolis (100,000 PE)
  • Qd = 13,000 m³/d
  • Turn-key new construction of WWTP incl. membrane technology with extended aeration
  • 17.75 million EUR invest 30 million EUR incl. operation
  • Principal Engineer
  • Yellow Book FIDIC + operation services 10 years

2007 – 2008, Montenegro

  • SWRO Budva (n.a.)
  • Qd = 11,000 m³/d
  • Turn-key construction and 10 years of operation of sea water desalination plant (reverse osmosis) including associated facilities, pipelines, collection wells, etc.
  • 6.7 m EUR
  • Principal Engineer
  • BOT-Contract

2002 – 2005, Croatia

  • WWTP Zagreb (1,250,000 PE)
  • Qd = 330,080 m³/d (442,370 m³/d)
  • Design and construction of the central waste water treatment plant for 1.25 million PE and in the final capacity stage for 1.5 million PE – design and construction of the associated administrative and operation buildings
  • 350 million EUR
  • Managing Director of Investment Company
  • Concession agreement + Silver Book + Operation services until 2028

2000 – 2003, Germany

  • WWTP Wuppertal-Kohlfurth (160,000 PE)
  • Extension of plant technology by means of installation of lamella separators
  • 3.8 million EUR
  • Principal Engineer
  • VOB/B

1998 – 2000, Russia

  • WWTP Zelenograd Moscow (370,000 P.E.) (stage 1)
  • Qd = 140,000 m³/d
  • Planning, detailed engineering, construction, commissioning, financing and operation of wastewater treatment plant
  • 12,5 years of operation
  • 65.3 million EUR
  • Principal Engineer
  • BOT-Contract

1997 – 1998, Poland

  • WWTP Zdzieszowice
  • Q = 150 m³/h cokery wastewater
  • Design and turn-key construction of biological waste water treatment with upstream denitrification of cokery plant
  • 4.7 million EUR
  • Principal Engineer
  • Yellow Book FIDIC

1996 – 1998, Slovakia

  • WWTP Kosice
  • Q = 1,400 m³/d cokery wastewater
  • Turnkey project WWTP for cokery plant
  • Double-line biological waste water treatment with nitrification/denitrification of coking plant waste water containing phenol
  • 3 million EUR
  • Principal Engineer
  • Yellow Book FIDIC

1996 – 1998, Germany

  • WWTP Saarbrücken-Brebach/Germany
  • Qd = 40,990 m³/d
  • Turnkey project, detailed engineering, construction and commissioning of a new treatment plant
  • 18.3 million EUR
  • Project Manager
  • VOB-Contract

1995 – 1996, Germany

  • WWTP Waldenburg (5,000 PE)
  • Equipment and engineering for the bio-denipho process
  • 1.6 million EUR
  • Turn-key project; approval planning, construction, mechanical and electrical equipment and commissioning of WWTP
  • Project Manager
  • VOB

1994 – 1995, Germany

  • WWTP Altenburg/Germany
  • Qd = 26,000 m³/d
  • Fully biological clarification of municipal waste water effluent with simultaneous elimination of Nitrogen and phosphorus. Installation concept as per the patented bio-denipho process. After 1995, conversion of the biological clarification stage to the SymBio™ process.
  • 25.1 million EUR
  • Project Manager
  • VOB

1993 – 1994, Germany

  • WWTP Weisswasser/Germany
  • Qd = 1,000 m³/d
  • BOT-Model of WWTP construction with aerobic biological treatment with nitrogen- and phosphorus removal and simultaneously aerobic sludge stabilization, sludge dewatering with membrane filter presses, sand filtration and UV-disinfection of the treated water
  • 14.9 million EUR
  • Project Manager
  • VOB